With over 50 years of experience in the GRP industry, we bring extensive expertise to projects of this nature.
As a vital component of Martinsville’s accessibility and infrastructure, the Owens Road Bridge required replacement to enhance its safety, durability, and overall structural integrity due to evident signs of wear. In response to this pressing need, Daracon Group, the main contractor, approached Mekina Industries to provide a suitable and long-lasting solution tailored to the project.
Mekina’s GRP Mek-Dek Formwork and GRP Cantilever panels were chosen to achieve these objectives. The Cantilever panel played an essential role, forming the deck edge, and serving as a permanent vertical shutter. This innovative approach reduced labour costs and improved safety during installation, which was carried out directly above the bridge – a critical aspect given the challenges of working over Dora Creek.
The successful implementation of Mekina’s GRP formwork resulted in a durable, efficient, and eco-friendly solution, enhancing the overall reliability of the newly constructed Owens Road Bridge, allowing vehicles and pedestrians to cross Dora Creek with confidence. The bridge replacement has also been designed to mitigate creek overflow risks through enhanced structural integrity and durability, accommodating higher water levels, in order to remain operational during severe weather or heavy rainfall.
Modular and lightweight, Mek-Dek Panels are highly manoeuvrable, requiring less manpower and fewer resources for transportation and installation. Since they remain in place permanently, there’s no need for dismantling or removal, saving valuable construction time. After determining the required panel specifications to support the concrete deck, Mekina initiated its custom manufacturing process. The bespoke panels minimise waste, contributing to the project’s overall sustainability credentials.
We collaborated closely with Daracon Group, providing solutions for any on-site challenges, ensuring both teams had a clear understanding of project requirements. By aligning strategies and maintaining open communication, we optimised resource use, minimised wate and cut costs, enhancing overall project efficiency.