Mek-Dek Offers Efficient Handling and Streamlined Construction
GRAHAM, a privately owned contractor with a reputation built on integrity and responsibility, was appointed to design and construct the vital bridge connections for Charterholme. Working alongside Bell Formwork Services Ltd, GRAHAM required a formwork solution that could accelerate progress, navigate logistical constraints, and provide long-term durability.
Mekina worked closely with both GRAHAM and Bell Formwork Services to ensure a seamless integration into the overall construction process, helping to keep the project on time and on budget.
Mekina supplied 162 Mek-Dek 60/125 panels, each measuring 3.2 metres long and produced in a concrete grey finish to match the bridge’s design. Installed directly onto steel beams, the lightweight modular panels ensured efficient installation.
In just one shift, three operatives were able to install 80 panels using an excavator and hydraulic scissor lift—a clear example of how Mek-Dek provided The Edge by helping the programme run ahead of schedule.
As a permanent formwork solution, Mek-Dek stays in place after installation, removing the need for formwork removal and cutting down on site activity, waste, and disruption.
At Charterholme, the entire GRP formwork installation was completed in a matter of days.