Project Overview
Mekina was selected by Skanska to supply its Mek-Dek GRP Permanent Formwork Panels for the project. The works involved installing Mek-Dek Standard panels above and between precast W13 beams and our Mek-Dek Smart Edge L-shaped Cantilever panels to span over the outer beam and form the cantilever deck edge. The panels were engineered to provide a load-bearing cantilever solution, tailored to the project’s safety and installation requirements.
As part of a strategic initiative, Skanska trialled Mekina as a potential long-term GRP formwork supplier, replacing the previously specified competitor product. The decision was driven by commercial evaluation and the need for a durable, safe, and efficient formwork system that could integrate seamlessly with their preferred edge protection system.